August 2019 News
A busy month for Vector with several projects commencing that would take them through the end of the year including…
The addition to the Air Charter Scotland fleet of a Cessna 525 (CJ) including ongoing Continuing Airworthiness support for this aircraft.
The initial review of a Challenger 300 type in preparation for placement on the Arena Aviation AOC.
Provision of system capable support to ASL Airlines with the Task by Task update of a 737-400
Provision of Part M support to BAE Systems to Part out a 146-200 yype aircraft.
Carry out a survey of a SAAB 2000 aircraft in the preparation for the placement on to the Lipican Aer AOC
A Pre-Warranty Paint Expiry Paint and Interior Survey was conducted on a 680A type through the AOC and on behalf of the aircraft owner in preparation for the aircraft going into Maintenance in September.